Saturday, October 3, 2009

More Pensive Selections

I so enjoy the beginnings of Fall.  Today I completed a project that I have been avoiding that being assembling a BBQ grill.  The entire project took me around 3 to 4 hours.  I did a great job all credit going to a well written instruction manual that came with it.  The grill is well constructed and should last as long as my last one.  My last one was a Weber gas grill, which we purchased in 2001.

Speaking on projects, I have quiet a few that need to be completed.  I have laminate flooring that needs to be completed in my wife’s office and I need to finish painting the bedroom hallway.  Both of these projects are very time consuming and unfortunately have to continue being on hold.

At the end of the month I take my certification exam for the Certified Information Systems Security Professional (CISSP).  I am not looking forward to this six hour exam, but I know I will be glad when it is over. I have to be certified by the 1st of January or I will loose my position at my job.  Yes the pressure is on.

2 comments:

  1. Wow, six hours! I don't think I would be able to have the patience to finish such a long exam, lol. Good luck on it!

    ReplyDelete
  2. Good luck on the exam. And tell me about home projects! I spent the summer ripping out carpet and painting; I just painted the bathroom Friday. I only have the kitchen/dining room to go, but I need a new floor in there--preferably wood.

    It never ends.

    K. Smith
    Eng. 226

    ReplyDelete